A jewel resting on spherical bearings
14 support bearings accommodating structural loads of up to 8,000 kN.
Singapore, Munich. Singapore has put a gem into its architectural crown, the “Jewel Changi Airport”. The largest single-layer
1_PR_Gazprom-Arena_EN_0616.pdf
June/16 PRESS RELEASE Football Stadium Zenit St. Petersburg: Gazprom-Arena Page 1 of 3 Uplift Forces, high loads, high rotations. St. Petersburg, Munich. The Gazprom-Arena in St. Petersburg is a
Tuned Mass Dampers
Spring-mass oscillator with oil damper for vibration reduction in vertical direction in bridges and floors or pendulum mass with oil damper for horizontal vibration reduction of slender
Detachable Anchorage for Expansion Joints
The Duisburg-Neuenkamp Rhine Bridge including expansion joints is transversely displaced.
Duisburg. The first section of the new Duisburg-Neuenkamp Rhine Bridge is already open to traffic, but it
1_PR_Hongkong-Zhuhai-Macau-Bruecke_EN_0616.pdf
June/16 PRESS RELEASE Fatigue-Proof and Wear-Free Tuned Mass Dampers for the Hong Kong-Zhuhai-Macao Bridge Page 1 of 5 Laminar flows put strain onto the 35 km long bridge over the Pearl River
Beautiful Bridge under Monitoring
The Valdebebas Bridge in Madrid was closely monitored during the construction phase
Madrid. How do loads really develop during the construction phase of a bridge? The planners in Madrid wanted to
MSO_Bauwerkschutzsysteme_Sp_RZ.pdf
Maurer Seismic Protection Systems Sistemas de protección de estructuras MAURER Fuerzas en movimiento Puente Abandoibarra Bilbao forces in motion Experiencia en innovación El Grupo MAURER es una
The lift bridge is lifted off its bearings
MAURER equips both the old Kattwyk Bridge and the new Kattwyk rail bridge in Hamburg.
The striking Kattwyk bridge in the Port of Hamburg now has a sister bridge bearing the same name. A special