Arama

93 Search results

Izmit Bay Bridge: 4 m more leeway in case of earthquake

…Even after an earthquake of magnitude 8, MAURER Fusebox ensures trafficability of the suspension bridge with the 2nd…

Fatigue-Proof an Wear-Free Tuned Mass Dampers

… to dangerous vibrations. To damp these vibrations, MAURER developed a TMD system (Tuned Mass Dampers) which is…

Floating expansion joints for Europe’s largest lift bridge

MAURER develops expansion joints that open and bearings that raise for Rotterdam.

Sales Manager Europa (m/w/d)

MAURER SE ist ein Stahl- und Maschinenbauunternehmen mit Schwerpunkten in Bauwerkschutzsystemen und konstruktivem…

Mexico: Luxury and Family Hotel Stands on 410 Seismic Isolators

… of up to ±500mm. An early involvement of MAURER’s earthquake experts in the structural planning not…

Mexico: Optimum seismic protection for airport terminal

… – the largest isolated building in Latin America. MAURER delivered 473 bearings, and besides the optimum…

Konstruktions-Mechaniker (m/w/d) Bernsdorf

… Die MAURER SE ist ein Stahl- und Maschinenbauunternehmen mit Schwerpunkten in Bauwerkschutzsystemen und konstruktivem…

The lift bridge is lifted off its bearings

MAURER equips both the old Kattwyk Bridge and the new Kattwyk rail bridge in Hamburg.

Retrofitted damping without intrusion into the bridge structure

… explains project manager Dipl.-Ing. Peter Huber from MAURER. To render this damping behavior possible, the…