405 Результаты поиска

WOM, Wheel of Munich – a new landmark for Munich.

…Presumably in spring 2019, the steel construction company MAURER SE of Munich will erect the WOM, Wheel-of-Munich Ferris wheel, in the Werksviertel of Munich.

8-ton mass dampers for the tennis elite in Paris

… Paris, the top matches will take place without breaks due to rain – thanks to a new retractable roof. MAURER equipped the slender steel construction with dampers which immediately respond to vibra- tions: to…

400-ton pendulum in the onion

… Der Masseblock besteht dabei aus einer massiven Stahlbox, die vor Ort mit Beton gefüllt wurde. MAURER fertigte nicht nur den Stahlbau, sondern überwachte den kompletten Einbau und nahm…

Record bridge in Shanghai with expansion joints from Munich

…t of almost 2 meters in longitudinal direction at both bridge ends. The expansion joints were manufactured at MAURER in Munich. The “Hutong Yangtze River Bridge” (“Hu” is the abbreviation for Shanghai, “Tong”for…

Noise-reduced expansion joints with special “tunneling”

… be watertight and noise-reduced and must be usable for all road users in the streetcar track area. MAURER developed a customized solution for the roadway expansion joints with a length of up to 43 m. In the…

30-ton bearings for the new Danube Bridge in Bratislava

… 21.000 t. Zudem müssen die Lager im Erdbebenfall 4.000 t Horizontalkraft aufnehmen. Lagerspezialist MAURER baute die Lager: Als einziger Hersteller konnte er zertifizierte Lager in dieser Dimension…

Applause on the highway for the Mega-MMBS

… 55 hours, 30 Mega-MMBS were installed, each weighing up to 8t. These foldable steel plates from MAURER can move in longitudinal direction and will bridge a 2.5-meter gap, which will emerge across the…

First hospital with seismic isolation in Mexico City

… seismic isolation made of elastomeric bearings for the first time. With its extensive know-how, MAURER was already involved in the planning phase and supplied 243 isolators, mainly lead rubber…

19 MN horizontal forces require vertically Page 1 of 4 installed special bridge bearings

… forces. For this reason, half of the bearings have been installed vertically. To this end, MAURER developed a special solution to ensure that no gaps can arise betweenthe sliding surfaces. In this…

More compact and improved: ETA-20/0028 for the XC1 expansion joint

… Innovation is quite big a word; however, the improvements are often in many small details. The MAURER XC1 expansion joint for road bridges sets a good example. Six improvements are the result of years of…