Investigación y desarrollo
Competencia técnica
Desarrollo de materiales
Materiales de deslizamiento Elastómeros, polímeros Fluidos para amortiguadores Aleaciones de acero
Proceso de desarrollo de productos
Fatigue-Proof an Wear-Free Tuned Mass Dampers
Dampers for the Hong Kong-Zhuhai-Macao Bridge
Zhuhai, München. Presently, and starting from Hong Kong, the 35km long Hong Kong-Zhuhai-Macao Bridge is being constructed over the delta of the Pearl
400-ton pendulum in the onion
Concrete-steel mass block damping vibrations in the Baku Tower.
Baku. In Baku, the capital of Azerbaijan, the tallest building in the Caucasus was built. The 277-m high Baku Tower is constantly
Little Space, High Loads, and Many Emotions
MAURER replaces old pot bearings at the Vienna Reichsbridge with compact spherical bearings.
Vienna, München. Extremely constricted space and high loads – this was the general framework for the
Dirección empresarial
Dirección empresarial
Holger Redecker
El Sr. Holger Redecker, ingeniero civil, ya trabajó como estudiante en prácticas en MAURER durante sus estudios desde