Search words under length of 4 characters are not processed.
400-ton pendulum in the onion
… the structure. The mass blockconsists of a massive steel box that was filled with concrete on site. MAURER not only manufactured the steel construction but also supervised the entireassembly and put the…
Applause on the highway for the Mega-MMBS
… 55 hours, 30 Mega-MMBS were installed, each weighing up to 8t. These foldable steel plates from MAURER can move in longitudinal direction and will bridge a 2.5-meter gap, which will emerge across the…
PR_140Jahre_SE_DT_web_1_.pdf
…November/16 PRESSEMITTEILUNG 140-Jährige beschenkt sich selbst mit SE Seite 1 von 2 MAURER AG in MAURER SE umgewandelt, tolles Fest am Frankfurter Ring. München. Das Fest war außergewöhnlich: Die MAURER SE spannte…