German Engineering since 1876
Maurer
Skip to main content

INFRASTRUCTURE

BUILDINGS

The ­ SHARKS® can be seen on the front side of the extension building, shown here during construction. The right-hand facade has already been cladded. The main building, which is being renovated, can be seen on the left.

First installation of pioneering MAURER seismic protection devices in a building in Kazakhstan.

The section of the new highway with the two bridges: the EcoViaduct in the foreground and the Parahaki Bridge over the Manawatū river in the background.

MAURER supplies expansion joints to New Zealand for the first time.

MAURER constructs, tests and supplies spherical bearings for three-dimensional movements.

Askoy-Brücke im Südwesten Norwegens

Askøy bridge renovation replaces centre beams instead of entire expansion joint .